S4E7 Two-Hour Flooring Challenge with Adam Weir! | Laminate & Hardwood Install Gone Off the Rails

Description:

We brought in Adam Weir from the Home Network to help… and then things got chaotic. What started as a simple flooring install turned into a full-on challenge—with a bet on the line: finish the hardwood install in 2 hours or jump in the lake.

In this episode, we:

  • Install laminate plank flooring in a trailer out in Westport

  • Tackle a traditional nail-down hardwood floor inside

  • Deal with unexpected problems (including a robbery!)

  • Navigate tight deadlines, tighter spaces, and serious behind-the-scenes tension

You’ll learn:

  • How to prep and lay both laminate and hardwood

  • Tricks for tricky spots like toilet flanges and floor vents

  • How to glue final rows when tools don’t fit

  • Why planning and teamwork matter (especially when filming!)

Join Contractor Ryan, Adam Weir, Dustin, Andy, and Abdul as they power through flooring, production chaos, and plenty of laughs. It’s half build tutorial, half reality TV, and all real.

🔨 Want more behind-the-scenes renos? Subscribe and follow alon